top of page
5 TONNE HELICOPTER PAD (1).png

We were approached by Glencore Mine to supply shop drawings, fabricate & erect a MIM Fallout bridge structure. The single overall span of the bridge was 45m as we spliced the structure in 3 sections for ease of fabrication & transport. All fabrication was based locally in Mount Isa and we had surveyors mark the location of our plinth and hold down bolts with millimetre accuracy. Installation was straightforward with erecting the three sections of the structure together. Waiting on calm winds, we used a 220 T crane with full counterweights and placed it down onto the hold-down bolts. As a team, we thoroughly enjoyed this project as the clients Naren, Chris & the BPL team were one of the most helpful and professional clients. A thumbs up for Naren, Chris & the PBL team we cannot wait for the next opportunity!

thumbnail_IMG_5868.jpg

Reference: Naren Ramachandran – 0423 841 902

Copy of Capability Statement (1).png
bottom of page