Working with engineers to fabricate and install structural works Remove walls, strengthen members.
2 X Drive through Awnings:
Site measer, fabricate and erect – lead time of installation 4 hrs
Playground Upgrade: 15 day lead time – Site measure, supply shop drawings, fabricate & install working with high traffic areas with vehicle and human interaction
Lead Time: Shop drawings – 4 days, Fabrication – 5 days, Remove existing structure – 2 days, erect new structure – 4 days.
 

Referee: Andrew Murchie – Manager Director Murchie Construction Pty Ltd Contact: 0419 646 574